18 communities · 2,995 MW proposed IT · 4.6 kW per resident · Year-round food · River protection · Waste heat reuse · Free charging · Subsidised renewable fuels · Transparent permitting status
COLUMBIA RIVER · WASHINGTON

Site plans that start with constraints.

The architecture connects AI, electricity, food, aquaculture, public heat and transport — but keeps nature, homes and permitting ahead of construction.

18 planned nodes2,995 MW ITNot yet authorised
Verified scenic photograph of the Columbia River region
Planning disclosure

These are reproducible site-planning archetypes, not actual properties. The map pins are approximate municipality reference coordinates. A real site plan requires survey-grade parcels, substations, flood maps and an environmental assessment.

Concept 1 — integrated river corridor campus

Schematic site for computing, greenhouses, aquaculture, dryers and transport
Schematic diagram. The river is a geographic context, not a proposed source of consumptive withdrawals.

Urban / institutional

Smaller heat-serving sites close to hospitals, public buildings and charging infrastructure.

Agricultural cluster

Orchard and grain drying, greenhouses, RAS aquaculture and nutrient recovery.

Small scenic-area nodes

Gorge towns need explicit viewshed, habitat, traffic and river-temperature screening.

Siting safeguards and buffers

A 2.995 GW IT network would consume approximately 3.44 GW at full IT load with PUE 1.15. Grid connection capacity, not river proximity, is the first gating factor.

Illustrated project concepts and visual reference library

The source illustrations are from the BC website and do not show constructed sites in Washington.

Town-by-town infrastructure layouts

All eighteen conceptual layouts show capacity-scaled modules, not surveyed land sites or technical construction plans.