Yakima — Columbia River community node
446.05 MW IT assigned to 96,968 residents using the same 2020 Census 4.6 kW-per-person rule.

Yakima
An agricultural and urban hub; unincorporated Yakima County has a temporary data-centre permitting moratorium.
Local data-centre zoning, utility capacity and moratoria must be verified before any project could proceed. Unincorporated Yakima County is under a temporary data-centre moratorium; it does not automatically establish the status inside Yakima city.
A community node, not a single sealed campus
Programme mix
- Orchard drying
- Food refrigeration
- Winter greenhouses
Proposed community outcomes include free locally produced food, public charging, access to clean vehicles, subsidised renewable fuels and hot water where a feasible distribution network exists. These are programme ambitions subject to economics and binding agreements.
What must be demonstrated first
- Parcel outside sensitive floodplain and habitat zones, with noise and visibility screening.
- Firm utility interconnection, incremental renewable-energy supply and customer rate protection.
- Thermal demand and suitable temperature levels for greenhouses, dryers, fish and public hot water.
- Water balance, nonconsumptive cooling assessment and state/tribal/federal environmental approvals where relevant.
Local network neighbours
Proposed land-use illustration only. No parcel, grid connection, river intake, utility capacity or construction permit has been identified. The real-town photograph at the top of this page is linked to Wikimedia Commons; the offline image is an illustrative local placeholder.