COLUMBIA RIVER · WASHINGTON
A 3 GW proposal must earn its electricity.
Columbia River hydro, additional wind and solar, storage and carefully specified low-emission backup must be modelled together.
18 planned nodes2,995 MW ITNot yet authorised

Renewables first. Firmness proved hourly.
The Columbia Basin has major hydroelectric assets, but existing hydropower is neither uncommitted nor automatically sufficient to power new data centres. Washington utilities must validate interconnection and resource adequacy for every node.
IT capacity2995 MW
Full facility load3444 MW
Annual facility energy27.15 TWh
Power contracts secured0

- New wind and solar energy, hourly matching and transparent procurement rather than annual certificates alone.
- Storage and dispatchable low-emission backup sized to realistic outage and drought cases.
- Utility studies for transformers, transmission constraints and reliability under N−1 contingencies.
- No involuntary rate increases or cross-subsidies imposed on existing residents.
Planning disclosure
No claim is made that the network is powered by 100% renewable electricity today. 3 GW of nameplate solar/wind is not equivalent to 3 GW of continuous IT supply.
Illustrated project concepts and visual reference library
The source illustrations are from the BC website and do not show constructed sites in Washington.