18 communities · 2,995 MW proposed IT · 4.6 kW per resident · Year-round food · River protection · Waste heat reuse · Free charging · Subsidised renewable fuels · Transparent permitting status
COLUMBIA RIVER · WASHINGTON

Renewable America starts with additional supply.

U.S. clean computing requires verifiable new power, not the assumption that an existing river dam is free capacity.

18 planned nodes2,995 MW ITNot yet authorised

National-scale renewables, local accountability

A Columbia River community network should contract incremental wind and solar, account for existing hydropower correctly, coordinate batteries and transparent backup, and disclose hourly matching and operating emissions.

The concept could be adapted to other U.S. river regions, but Washington-specific restrictions, ecological conditions, cooling needs and community representation make this corridor distinctive.

Integrated renewable energy and farming concept
Illustration from the British Columbia reference package: demonstrates a concept, not an American power station.