18 communities · 2,995 MW proposed IT · 4.6 kW per resident · Year-round food · River protection · Waste heat reuse · Free charging · Subsidised renewable fuels · Transparent permitting status
WASHINGTON · YAKIMA BASIN

Sunnyside — Columbia River community node

75.33 MW IT assigned to 16,375 residents using the same 2020 Census 4.6 kW-per-person rule.

18 planned nodes2,995 MW ITNot yet authorised
Verified scenic photograph of the Columbia River region
Real photograph of Sunnyside Washington, via Wikimedia CommonsReal place photograph · image licence
Yakima Basin · Yakima irrigation basin

Sunnyside

Agricultural processing and dairy operations create potential links to drying, waste-to-biogas and heat use.

2020 Census residents16,375
Allocated IT power75.33 MW
Basis4.6 kWper resident
Planning disclosure

Local data-centre zoning, utility capacity and moratoria must be verified before any project could proceed. Unincorporated Yakima County is under a temporary data-centre moratorium; it does not automatically establish the status inside Yakima city.

A community node, not a single sealed campus

Concept site layout showing AI, greenhouses, aquaculture, food dryers and community energy
Illustrative campus module, not a surveyed parcel. Node capacity may be split among sites.

Programme mix

  • Dairy & biogas
  • Crop drying
  • Greenhouses

Proposed community outcomes include free locally produced food, public charging, access to clean vehicles, subsidised renewable fuels and hot water where a feasible distribution network exists. These are programme ambitions subject to economics and binding agreements.

What must be demonstrated first

Local network neighbours

Sunnyside — local visual concept

Proposed land-use illustration only. No parcel, grid connection, river intake, utility capacity or construction permit has been identified. The real-town photograph at the top of this page is linked to Wikimedia Commons; the offline image is an illustrative local placeholder.

Concept site layout for Sunnyside
Town-specific modular layout generated from the population-scaled IT allocation; not a surveyed land parcel or licensed construction design.