Pasco — Columbia River community node
354.70 MW IT assigned to 77,108 residents using the same 2020 Census 4.6 kW-per-person rule.

Pasco
A major Tri-Cities partner, but the city adopted a six-month new-data-centre moratorium on 20 July 2026.
The Pasco city council adopted Ordinance 4850 on 20 July 2026, imposing a six-month moratorium on new AI/data-centre permit applications. This is a community allocation, not a site available for application.
A community node, not a single sealed campus
Programme mix
- Food logistics
- Prawn farms
- Renewable fuels
Proposed community outcomes include free locally produced food, public charging, access to clean vehicles, subsidised renewable fuels and hot water where a feasible distribution network exists. These are programme ambitions subject to economics and binding agreements.
What must be demonstrated first
- Parcel outside sensitive floodplain and habitat zones, with noise and visibility screening.
- Firm utility interconnection, incremental renewable-energy supply and customer rate protection.
- Thermal demand and suitable temperature levels for greenhouses, dryers, fish and public hot water.
- Water balance, nonconsumptive cooling assessment and state/tribal/federal environmental approvals where relevant.
Local network neighbours
Proposed land-use illustration only. No parcel, grid connection, river intake, utility capacity or construction permit has been identified. The real-town photograph at the top of this page is linked to Wikimedia Commons; the offline image is an illustrative local placeholder.